Introduction to BIM Coordination and Benefits of BIM Coordination in 2023


Introduction to BIM Coordination and Benefits of BIM Coordination in 2023


Hello friends, Welcome to our blog post. In today's post I will share amazing information about the: Introduction to BIM Coordination and Benefits of BIM Coordination in 2023.

BIM coordination


So, Read these : Introduction to BIM Coordination and Benefits of BIM Coordination in 2023post completely.  After reading these today's post, you will get clear about the concept about the coordination in BIM with it's benefits.

So guys, don't forget to like & share these today's post. Also Follow our social media pages, for such more new amazing ideas and posts.

BIM coordination


Without wasting more time, Let's start with these post.....

Few years ago, the most of the construction process was depends on the paper drawings. 

After The introduction of 2D models in AutoCAD in the 1960s, these become very helpful tool which helps to save the time, but still had problems connecting the 2D drawing with the 3D real-world object.

After the year 1980s, there was another evolution of the construction industry, with companies looking into adopting various digital technologies which includes the BIM.

This is how digital transformation process have been started in the construction industry. 

Unfortunately, it took BIM a while to become widely accepted as well as adopted, but now it is used on a regular basis.

With the help of BIM coordination, Construction Industry professionals can easily solves many construction problems.

Both BIM clash detection and BIM coordination are mostly interchangeable in the construction industry. 

Both of them are considered essential for a design to be realized as expected, with no problems or issues.

So, what is BIM coordination? 

BIM coordination is a process of BIM that facilitates the collaboration between MEP engineering, structural engineering as well as the architectural plans.

BIM coordination


One of the main goals in these was to reach more efficient collaboration results by combining the efforts of different disciplines within a particular construction project. 

As such, clash detection is an essential part of 3D BIM coordination will help to locate issues between different designs as well as presents in the  models to work out the most efficient way to fix them.

In models,  the Clashes are either soft or hard.

 Here the main differences between the two is the amount of effort needed to solve a particular case. 

BIM coordination


Soft clashes can easily be resolved by slightly making few changes in the  Model, while some of the harder cases would require a team of competent engineers to work through the model as well as helps to resolve them.

BIM coordination deals with multidisciplinary models, which are the collection of the different models in one place, helping to look for the construction issues. 

Some of the model types that can be included in the multidisciplinary models which mainly includes the following types mentioned below:

  • Interior architectural model
  • Mechanical services model
  • Prefabrication model
  • Structural model
  • Exterior architectural model
  • Landscape model
  • Electrical services model

The benefits of BIM coordination

Two of the main professionals getting  benefits from the introduction of BIM coordination into the construction process are engineers as well as the architects. 

BIM coordination


Here are the several different benefits that 3D BIM coordination mainly provides, which ultimately including, but not exclusive to the following :

  • Easier location of design errors that would cost a lot of money to fix in the final project state.
  • Second benefit are it Maximizes the utilization of the building space.
  • With the help of softwares for Clash detection such as Revit or Navisworks.
  • These softwares  are capable of reducing the number of changes that would’ve happened in the construction process, if the clashes were not detected sooner.
  • Real time construction scheduling is also one of the by products of 3D BIM coordination.
  • One more advantage of the BIM coordination was that it makes very easier to collaborate with the different departments which mainly includes the engineers, architects, contractors, etc. 
  • Hence, it helps in improving the accuracy of the design as a whole as well as to resolving issues before they’ve become much bigger down .

  • Multiple engineers can work on a unified model that would reflect changes from each as well as every one of them.

Therefore, the BIM coordination offers a great variety of benefits for all types of the construction project as a whole, improving coordination between departments but also in the stages of the project, helping with compatibility issues, excessive waste issues, and many others.




For easy understanding about the BIM coordination and it's benefits , you can take help of below video :

Video 1 :-  What is BIM Coordination ?


Video 2 :-  Model Coordination in Naviswork  ?







  • Thankyou friends for reading my Blog. Don't forget to share & comment on today's post.  I hope you definitely like these Blog & understand these concept and learn new concept & ideas from these post. 

    For such new Blog related updates, follow to our Page. Thankyou. 